February 01 & 02 – Thursday & Friday

Summary:

  1. Mosaic Platform is up
  2. Fridge is in place
  3. Lights installed for our feature wall, vanity top and wardrobe
  4. Chemical wash is done
  5. Cellini Furniture is in!
  6. Roller binds and curtains are installed

Comments for Cellini: 

Thumbs-up:
Cellini is really professional and punctual. They are supposed to deliver from 1pm-3pm but arrived before 1pm and waited. Our sofa looks great!  

Thumbs-down
We have a tiny little dent for the $50 coffee-table and the “skin” of the sides of the bed frame board (beneath the mattress) came off.  Hb decided to leave them be since they are not very noticeable and minor. 

Our Day:

Although the place is chemical washed; we still cleaned up the place ourselves. Hb was really great; he did the all sweeping, mopping etc etc and was efficient and fast! Finally after 3-4hrs of hardwork, the tiles are pristine clean liao! 

Instead of leaving the sofa, bed frame & coffee table in their boxes, we decided to open and inspect them and also to get the feel of the place. The day curtain looks great with the free grey Cellini cushions and the 3-module sofa fits in really nicely and they are smacked just right infront of our 6ft feature wall! However, my camera ran out of battery and my n73 refused to be connected to my lappy. L So, I will try to post the pictures which I took with the n73 soon. 

Outstanding Tasks
The following items are still outstanding: 

  1. Installation of solid top, backslash and tap for kitchen cabinet
  2. Installation of black glass for feature wall
  3. Installation of mosaic platform
  4. Installation of study ledge and display cabinet
  5. Installation of mirror in masterbed room toilet
  6. Installation of glass for the wardrobe drawers panels
  7. Installation of the “black laminate poles” to create a walkway in living room
  8. Installation of planks inside the utility cabinet to create shelves for shoes
  9. Installation of bed side ledges for masterbed room
  10. Installation of toilette set
  11. Installation of lights inside the wardrobe & mirror boxup
  12. Installation of lights and dining lights at the dining area
  13. Installation of lights for the kitchen cabinets
  14. Installation of additional dimmers & shifting of points
  15. Installation of speakers
  16. Installation of roller blinds
  17. Rectification of defects