February 08 – Thursday

Summary:

  1. Dining Lights installed
  2. Phillips LCD TV installed and mounted
  3. Toshiba Washer installed
  4. Gas opened

 

Comments: 

WHITE COLLECTION SUCKS LIKE HELLThey lagi stupid – arranged our storage bench delivery from 12pm-2pm and our dining chairs at 5pm-7pm! 

The BEST part is that the last minute (as usual), they called and said that they cannot deliver the storage bench and will arrange another delivery. My hb wasted the whole afternoon waiting for a non existent storage bench! 

However, our dining chairs did arrive but we refused to pay a single cent! We say we will only pay in full only when the storage bench arrive. Therefore, we decided to let them f*ckup our deliver of storage for as long as they want and so we can enjoy the free dining chairs. *hahahha*  

CARPETS
We went to the recommended Pacific Trading Pte Ltd @ Bukit Timah Plaza and regretted getting the carpets from them! The boss is not honest, telling me that they are selling the supermini carpet @ $20 and half an hour later, claimed that its going for $28 when I decided to get it! And the super shaggy rag that they are selling is going for 50% discount – which is still $400 plus. It is still slight more expensive than the super shaggy rags sold by Carpets & Furnishing @ Tagore Drive UA building.
 

We decided to get the shaggy rug sold by Carpets & Furnishing for only $255. Cheap within our budget and honest. 

 

Outstanding Tasks
The following items are still outstanding: 

  1. Installation of solid top, backslash and tap for kitchen cabinet
  2. Installation of black glass for feature wall
  3. Installation of mosaic platform
  4. Installation of study ledge and display cabinet
  5. Installation of mirror in masterbed room toilet
  6. Installation of glass for the wardrobe drawers panels
  7. Installation of the “black laminate poles” to create a walkway in living room
  8. Installation of planks inside the utility cabinet to create shelves for shoes
  9. Installation of bed side ledges for master bed room
  10. Installation of toilette set
  11. Installation of lights inside the wardrobe & mirror boxup
  12. Installation of lights and dining lights at the dining area
  13. Installation of lights for the kitchen cabinets work surface
  14. Installation of additional dimmers & shifting of points
  15. Installation of speakers
  16. Installation of roller blinds
  17. Reinstallation of skirting, kitchen Cabinet door (removal of laundry hanger)
  18. Rectification of defects

 

Photos still stuck within the n73. Dunno why it refused to connect my labby. Will retake the photos and post them up soon. This is one of the photo taken last week. Enjoy! 😉

sofa 

Only one week to go! Hopefully everything can be done by next week.