March 3rd – Saturday

Outstanding Tasks
The following items are still outstanding: 

  1. Installation of solid top, backslash and tap for kitchen cabinet
  2. Installation of black glass for feature wall & dining table
  3. Installation of mosaic platform
  4. Installation of study ledge and display cabinet
  5. Installation of mirror in masterbed room toilet
  6. Installation of glass for the wardrobe drawers panels
  7. Installation of the “black laminate poles” to create a walkway in living room
  8. Installation of planks inside the utility cabinet to create shelves for shoes
  9. Installation of bed side ledges for master bed room
  10. Replacement of maindoor peep-hole
  11. Installation of toilette set
  12. Installation of lights inside the wardrobe & mirror boxup
  13. Installation of lights and dining lights at the dining area
  14. Installation of lights for the kitchen cabinets work surface
  15. Installation of additional dimmers & shifting of points
  16. Installation of speakers
  17. Installation of roller blinds
  18. Reinstallation of skirting in masterbed room, kitchen Cabinet door , dismantling of laundry hanger
  19. Installation of storeroom rack
  20. Rectification of DEFECTS!!