February 03 – Saturday

Summary:

  1. Backslash installed
  2. Mirror for vanity top installed
  3. OM dining table is in!
  4. HN delivered our 37” Phillips LCD TV

Comments for OM: 

Thumbs-up:

OM is really professional They arrived within the agreed timeslot. Our dining table looks great!  
Thumbs-down

The flower design for the Fiamma Dining Table is not as fine as the one we saw at the showroom. There is a very tiny dent at one of the steel legs. WHITE COLLECTION SUCKS

They unbelievably called up this morning and say there is no stock for our dining chairs! Imagine our shock and horror since they have called up yesterday to confirm delivery from 5-7pm.And the best part is that they DO NOT KNOW when the shipment is in and they CANNOT GURANTEE that we can get our dining chairs before CNY. 

Heck! I called in numerous times and demand for an explanation! For the last few occasions they kept mixing up the delivery date! And now this!I wish there is no other better way to express our frustration except: &^%@^%^!@#^&!@#&*^!&%!! 

Our Day:
Me and mum cleaned up the Kitchen Cabinets and fridge. Hb arrived at around 3pm for a late lunch. He also put up the curtains to see the effect and was very pleased with the cosy effect. I like the “scarlet hotel” color combination and ambience.

However, one of the curtains have some “stretch” marks but Kevin promptly arrived to collect it back and promised to make us another one! Kudos to Kevin for his timely service! 🙂We proceed to IKEA and got ourselves some bowls, plates, chairs etc for our new place.As promised: here are the photos!

Kelvin’s brainchild – mosaic platform!

platform.JPGplatformv2

Lightsup!

fridgemirrorlightswarerobelights
Our living area
 livingrm1livingrm2livingrm3

Kitchen with blackslash! Photos courtesy of Kelvin.kitchen1kitchen2kitchen3
Outstanding Tasks
The following items are still outstanding: 

  1. Installation of solid top, backslash and tap for kitchen cabinet
  2. Installation of black glass for feature wall
  3. Installation of mosaic platform
  4. Installation of study ledge and display cabinet
  5. Installation of mirror in masterbed room toilet
  6. Installation of glass for the wardrobe drawers panels
  7. Installation of the “black laminate poles” to create a walkway in living room
  8. Installation of planks inside the utility cabinet to create shelves for shoes
  9. Installation of bed side ledges for masterbed room
  10. Installation of toilette set
  11. Installation of lights inside the wardrobe & mirror boxup
  12. Installation of lights and dining lights at the dining area
  13. Installation of lights for the kitchen cabinets
  14. Installation of additional dimmers & shifting of points
  15. Installation of speakers
  16. Installation of roller blinds
  17. Rectification of defects